EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
VelocityXLRG
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (263)
Research
- (2)
Purchase Kit
- (1)
Workshop
- (7)
Misc. Parts
- (1)
Fuselage
- (81)
-
Nose Gear
-
actuator
-
Actuator
-
Actuator
-
Actuator
-
Main gear opening,...
-
Misc items
-
Close main gear...
-
Closing main gear...
-
Close off main gear...
-
Canard and Cowlijng...
-
Sanding & Actuators
-
Actuators, Doors
-
Canard Glass work...
-
Sanding and micro work
-
Sanding and micro work
-
Cowling fit and micro
-
Completed glassing...
-
Fit cowling
-
Fit cowling
-
Cowling fit and micro
-
Cowling fit to wing
-
Sanding and micro work
-
Landing Light
-
Micro work
-
Sanding and micro work
-
Micro work
-
Fabricate...
-
Door strake
-
Fabricate...
-
Fabricate...
-
Install baffles in...
-
Install baffles in...
-
Install baffles in...
-
Sanding and body work
-
Sanding and body work
-
Sanding and body work
-
More sanding and...
-
More sanding and...
-
Wheel well paint and...
-
Glass nav light...
-
Design and build nav...
-
Sand and micro
-
Repair wing surface...
-
Work on component...
-
Fuselage body work
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Sanding
-
Cowling
-
Cowling
-
Cowling
-
Sanding
-
Sanding
-
Micro and sanding
-
NACA Air Vents
-
NACA Air Vents
-
NACA Air Vents
-
Nose section
-
Nose section
-
Seats
-
Spar
-
Spar
-
Spar
-
Windows
-
Bench Back and Spar...
-
Sump Tank, Rear...
-
Windows
-
Clean Interior Windows
-
Cut Keel
-
Keel & Sanding
-
Landing Light...
-
Seat Hardpoints...
-
Oil Heater, Seat...
-
Oil Cooler &...
-
Position Canard...
-
Triax Keel to Bulkhead
-
Keel & Hydraulics
-
Prepare Keel
Firewall
- (1)
Canard
- (31)
Wings
- (25)
Controls
- (10)
Nose Gear
- (14)
Main Gear
- (21)
Avionics
Lighting
Instrument Panel
- (1)
Engine
Propeller
Fuel System
- (62)
Interior Finish
Paint / Decals
- (5)
Inspection
Tools
Auto Entry
- (1)
Builder Name:
Patrick Mayworm
-
Project:
Velocity - XL/RG
-
VIEW REPORTS
Total Hours:
1417
Total Flight Time:
Start/Last Date:
Jul 28, 2001 - No Finish Date
Engine:
Continental IO 550N
Propeller:
Catto
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=VelocityXLRG
Home or Last Project Picture
Nov 12, 2019
Seat Hardpoints & NACA Scoops
- (16 hours)
Category: Fuselage
Installed NACA and fresh air scoops, glassed all seats and seat belt hard points
NACA Scoops2.jpg
Pilot Seat Hardpoints.jpg
Co Pilot Seat Hardpoints.jpg
Pilot Seatbelt Hardpoint.jpg
Co Pilot Seatbelt Hardpoint1.jpg
Rearseat Belt Hardpoint1.jpg
Rearseat Belt Hardpoint2.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.